Aaron HV is providing the design & installation of new 400kV circuits between the newly constructed converter stations and the existing 400kV SSE & National Grid substations at Peterhead and Drax (respectively).

Aaron

HV

Scope

Aaron HV’s scope of works include the civils i.e. duct and trough installations as well as cable installation with jointing and termination support provided to NKT.